The engineer ______ the watch to the relieving officer if there is reason to believe that the latter is obviously not capable of carrying out the watch-keeping duties effectively.
A.shall take over
B.shall not take over
C.shall hand over
D.shall not hand over
第1题:
STCW78/95 Convention states that the officer in charge of the engineering watch is the representative
A.ship-owner's
B.master's
C.chief engineer's
D.manager's
第2题:
At an unsheltered(开放的) anchorage the chief engineer officer shall consult with ______whether or not to maintain an underway watch.
A.the engineer officer in charge of watch
B.the deck officer in charge of watch
C.the master
D.the chief mate
第3题:
Do not______the watch to the relieving officer until he has verbally expressed his acknowledgment of the information which has been passed by the officer handing over.
A.turn over
B.hand over
C.hands off
D.take over
第4题:
the depth of the water at the berth
the ship‟s draught
the duty of the relieving officer
the arrangement of anchor and the scope of the anchor chain
第5题:
shall take over
shall not take over
shall hand over
shall not hand over
第6题:
in any emergency or if in any doubt as to what decision or measures to take
in the event of any impending action in machinery spaces that may cause reduction in ship’s speed
when isolating and bypassing machinery to be worked on
co-operating with any engineer in charge of maintenance work
第7题:
continue to be responsible for machinery space operations despite the presence of the CE
hand over the responsibility actively
be responsible for the watching together with the chief engineer
assistant the chief engineer to control the machinery
第8题:
a watch which is kept with lower standard
a watch which is kept when the ship isnt sailing
a watch which is kept when the ship is sailing
a watch which is kept when the ship is in a restricted visibility area
第9题:
Sea protest
Deck log
Accident report
Seamans book
第10题:
well trained
in good luck
in good health
sufficiently rested
第11题:
the master
the chief engineer
the officer on duty
the engineer in charge of watch
第12题:
to ensure the main propulsion plant are kept under constant surveillance
to ensure the auxiliary systems are kept under constant surveillance
to inspect the steering gear spaces at suitable intervals
to inspect and overhaul the equipments in his charge
第13题:
I am the relieving/ in-coming third officer, here is my ID card.
第14题:
The Company should establish in the SMS that ______has the overriding authority and the responsibility to make decisions with respect to safety and pollution prevention.
A.the master
B.the chief engineer
C.the officer on duty
D.the engineer in charge of watch
第15题:
When a ship is in port, who will keep gangway watch?()
第16题:
the engineer officer in charge of watch
the deck officer in charge of watch
the master
the chief mate
第17题:
as long as
unless
despite
till
第18题:
captain
chief engineer
chief engineer and captain consult together
chief engineer and superintend consult together
第19题:
there is reason to believe that the latter is not capable of carrying out the watchkeeping duties effectively
the ship is fitted with automatic steering
there is daylight or darkness
at no time shall the bridge be left unattended
第20题:
on
under
off
over
第21题:
An officer.
A sailor on duty.
Wharf man.
An engineer.
第22题:
I NOW HAVE THE WATCH.
I NOW HAVETHE CONN.
YOU NOW HAVE THE WATCH.
YOU NOW HAVE THE CONN.
第23题:
keep
keeping
keeps
is keeping