更多“12What is the relative priority of project Cost, Schedule and Quality? A.1)Cost - 2)Schedu ”相关问题
  • 第1题:

    3 Project tradeoffs are usually made by comparing _____ and constraints.

    A. Time, cost, and quality

    B. Time, risk, and quality

    C. Risk, quality, and manpower availability

    D. Cost, quality, and technical performance

    E. Cost, quality, and risk


    正确答案:D

  • 第2题:

    85 Project tradeoffs are usually made by comparing _____ and constraints.

    A. Time, cost, and quality

    B. Time, risk, and quality

    C. Risk, quality, and manpower availability

    D. Cost, quality, and technical performance

    E. Cost, quality, and risk


    正确答案:D

  • 第3题:

    ● Project tradeoffs are usually made by comparing _____ and constraints.

    A Time, cost, and quality

    B Time, risk, and quality

    C Risk, quality, and manpower availability

    D Cost, quality, and technical performance

    E Cost, quality, and risk


    正确答案:D

  • 第4题:

    57 Which of the following are types of status reports?

    A. document, variance, trend and exception

    B. cost, trend, schedule and acquisition

    C. cost, schedule, technical performance

    D. analysis, cost, performance and schedule

    E. All of the above.


    正确答案:C

  • 第5题:

    139 Which of the following are types of status reports?

    A. document, variance, trend and exception

    B. cost, trend, schedule and acquisition

    C. cost, schedule, technical performance

    D. analysis, cost, performance and schedule

    E. All of the above


    正确答案:C