Assigning resources in an attempt to find the shortest project schedule consistent with fixed resource limits is called resource _____.
A.Allocation.
B.Partitioning
C.Leveling
D.Quantification.
E.None of above.
第1题:
● The Work Breakdown Structure (WBS) is the basis for communicating:
A Project scope, cost control, schedule, quality
B Project objectives, dependencies, plan, cost control
C Project scope, schedule, staffing, cost control
D Project scope, quality, schedule, dependencies
E Project budget, schedule, risk factors, work assignments.
第2题:
[A] assignment
[B] temptation
[C] attempt
[D] commission
第3题:
A、trial
B、contempt
C、desire
D、attempt
第4题:
A.endeavor
B.try
C.strive
D.attempt
第5题:
His action is always()with his words.
A. constant
B. continuous
C. consistent
第6题:
A.TheOracledatabasewillcheckalldatablocksbygoingthroughthedataoneachblock,makingsurethedataisself-consistent.
B.DBWnandthedirectloaderwillcalculateachecksumandstoreitinthecacheheaderofeverydatablockwhenwritingittodisk.
C.TheOracledatabasewillcheckdatablocksbelongingtotheSYSTEMtablespaceonly,bygoingthroughthedataoneachblock,makingsurethedataisself-consistent.
D.TheOracledatabasewillcheckdatablocksbelongingtotheSYSAUXtablespaceonly,bygoingthroughthedataoneachblock,makingsurethedataisself-consistent.
E.TheOracledatabasewillcheckdatablocksintheSYSTEMandSYSAUXtablespacesonly,bygoingthroughthedataoneachblock,makingsurethedataisself-consistent