53 The Quality Risk _____ .
A. is minimized through continuous monitoring.
B. is considered a long term risk.
C. will be reflected in the in-service life of the project result.
D. B and C
E. All of the above
第1题:
85 Project tradeoffs are usually made by comparing _____ and constraints.
A. Time, cost, and quality
B. Time, risk, and quality
C. Risk, quality, and manpower availability
D. Cost, quality, and technical performance
E. Cost, quality, and risk
第2题:
● Project tradeoffs are usually made by comparing _____ and constraints.
A Time, cost, and quality
B Time, risk, and quality
C Risk, quality, and manpower availability
D Cost, quality, and technical performance
E Cost, quality, and risk
第3题:
储蓄增加将导致()
A.IS曲线向右移动
B.IS曲线向左移动
C.LM曲线向右移动
D.LM曲线向左移动
第4题:
154 Project trade-offs vary between
A. risk, cost and schedule.
B. direct cost, indirect cost, and resource availability
C. quality, schedule and time
D. cost, quality and schedule
E. contract terms, scope and budget
第5题:
第6题:
降低存款准备金率,()曲线,向()移动
A.IS曲线,左
B.IS曲线,右
C.LM曲线,左
D.LM曲线,右