55 The core function of the project manager is
A. Systems design
B. Client interfacing
C. Quality assurance
D. integration
第1题:
A. Design 1 is a looped triangle design.
B. Design 2 is a looped triangle design.
C. Design 2 achieves quick convergence using RSTP.
D. Both designs supportstateful services at the aggregation layer.
E. Design 2 is the most widely deployed in enterprise data centers.
第2题:
第3题:
在对原理图进行电气规则检查前,可以()打开规则设置界面。
A.design-Document Options
B.Project-Project Options
C.Tools-Schematic Preferences
D.Project-Configuration Manager
第4题:
The switches shown in the diagram, Core and Core2, are both Catalyst 2950s. The addressing scheme for each company site is as follows:Router Ethernet port - 1st usable addressCore - 2nd usable addressCore2 - 3rd usable addressFor this network, which of the following commands must be configured on Core2 to allow it to be managed remotely from any subnet on the network? ()
A.Core2(config)# interface f0/0 Core2(config-if)# ip address 192.168.1.10 255.255.255.248
B.Core2(config)# interface vlan 1 Core2(config-if)# ip address 192.168.1.11 255.255.255.248
C.Core2(config)# line con 0 Core2(config-line)# password cisco
D.Core2(config)# line vty 0 4 Core2(config-line)# password cisco
E.Core2(config)# ip default-gateway 192.168.1.9
F.Core2(config)# ip route 0.0.0.0 0.0.0.0 192.168.1.8
第5题:
执行菜单命令(),系统开始对项目进行编译,并生成信息报告
A.project/compile PCB project
B.project/project option
C.Design/netlist/protel
D.design/make project library
第6题:
在原理图界面将鼠标光标设置为large cursor 90应选择()。
A.Project-Project Options..
B.Project-Project Templates...
C.Tools-Schematic Preferencs...
D.Design-Document Options...