    An application fails to start after a Technology Level upgrade. The application vendor recommends that two filesets upgraded as part of the new Technology Level be rejected. What is the recommended method for performing this task?()

    • A、Run instfix -u to reject the filesets.
    • B、Run installp -r to reject the filesets.
    • C、Run installp -u to uninstall the filesets.
    • D、Restore the system to previous state from the system backup.

    正确答案:D

  • 第2题:

    A solution for two batch applications was proposed in Companycom meeting. They are currently running in two LPARs on a p690. On a daily basis, both applications use 15% of the machine for their workload, and increase to 100% when their weekly reports are run. Since the reports are not run on the same day, what is the best solution?()

    • A、COD
    • B、DLPAR
    • C、One big LPAR
    • D、Two separate p690 machines

    正确答案:B

  • 第3题:

    What is a benefit of storage virtualization technology in the IBM System Storage DS8800()

    • A、fewer expansion units are needed
    • B、multiple workloads can be managed separately
    • C、resource isolation is eliminated
    • D、Linux can run in LPAR mode

    正确答案:B

  • 第4题:

    Which of the following best describes Simultaneous Multi-threading (SMT)?()

    • A、A POWER5 microprocessor feature that allocates two processors to each application
    • B、A Workload Manager feature that allows two processing threads to be executing on a single processor
    • C、An AIX v5.2 feature that allows two processing threads to be executing on a single processor concurrently
    • D、A POWER5 microprocessor feature that allows two processing threads to be executing on a single processor concurrently

    正确答案:D

  • 第5题:

    Which two statements are correct regarding IS-IS?()

    • A、Routers maintain a single link-state database per area.
    • B、Routers maintain a separate Level 1 link-state database.
    • C、Routers maintain a separate Level 2 link-state database.
    • D、Routers maintain a single Level 1 link-state database per area.

    正确答案:B,C

  • 第6题:

    You are the network administrator for your company. The network consists of a single Active Directory domain. All servers run Windows Server 2003. All client computers run Windows XP Professional.You install and configure a single server to run Windows Server Update Services (WSUS). You configure the appropriate Group Policy settings to specify separate WSUS target groups for client and server computers. You need to ensure that computers automatically assign themselves to the correct computer group.  What should you do?()

    • A、In the WSUS console, configure Computer Options so that Use group policy or registry settings on computers is selected.
    • B、In the WSUS console, configure Computer Options so that Use the Move Computers Task in Windows Server Update Services is selected.
    • C、In the WSUS console, create the appropriate computer groups.
    • D、Create organizational units (OUs) for each group.

    正确答案:A,C

  • 第7题:

    单选题
    The Information Technology (IT) department wants to consolidate two 4-way p5-550 servers onto an 8-way p5-570. However, the departments using the p5-550 servers are concerned about quality of service after consolidation. Which per-partition processor allocation would provide comparable performance while still allowing the POWER5 hypervisor to optimize the processing workload of the server?()
    A

    4.0 processing units, 4 virtual processors, capped mode

    B

    4.0 processing units, 4 virtual processors, uncapped mode

    C

    4.0 processing units, 8 virtual processors, capped mode

    D

    4.0 processing units, 8 virtual processors, uncapped mode


    正确答案: B
    解析: 暂无解析

  • 第8题:

    单选题
    What is a benefit of storage virtualization technology in the IBM System Storage DS8800()
    A

    fewer expansion units are needed

    B

    multiple workloads can be managed separately

    C

    resource isolation is eliminated

    D

    Linux can run in LPAR mode


    正确答案: C
    解析: 暂无解析

  • 第9题:

    多选题
    Which two code fragments will execute the method doStuff() in a separate thread?()
    A

    new Thread() {public void run() { doStuff(); }};

    B

    new Thread() {public void start() { doStuff(); }};

    C

    new Thread() {public void start() { doStuff(); }}.run();

    D

    new Thread() {public void run() { doStuff(); }}.start();

    E

    new Thread(new Runnable() {public void run() { doStuff(); }}).start();


    正确答案: C,A
    解析: 暂无解析

  • 第10题:

    单选题
    You need to recommend a technology for the VDI deployment to maximize the number of VMs that can run concurrently on a single Hyper-V host. What should you include in the recommendation?()
    A

    RemoteFX

    B

    Dynamic Memory

    C

    CPU Core Parking

    D

    Fair Share CPU Scheduling


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()
    A

    Each Linux application can run in a Workload Partition, reducing the management efforts.

    B

    Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform licensing.

    C

    Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all partitions.

    D

    Using micro-partitions on Power Systems allow the workloads to share the processing resources, increasing the overall system utilization.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A solution for two batch applications was proposed in Companycom meeting. They are currently running in two LPARs on a p690. On a daily basis, both applications use 15% of the machine for their workload, and increase to 100% when their weekly reports are run. Since the reports are not run on the same day, what is the best solution?()
    A

    COD

    B

    DLPAR

    C

    One big LPAR

    D

    Two separate p690 machines


    正确答案: D
    解析: 暂无解析

  • 第13题:

    You need to relocate the existing user and computer objects in your company to different  organizational units.     What are two possible ways to achieve this goal()

    • A、Run the Dsmod utility.
    • B、Run the Active Directory Migration Tool (ADMT).
    • C、Run the Active Directory Users and Computers utility.
    • D、Run the move-item command in the Microsoft Windows PowerShell utility.

    正确答案:A,C

  • 第14题:

    The Information Technology (IT) department wants to consolidate two 4-way p5-550 servers onto an 8-way p5-570. However, the departments using the p5-550 servers are concerned about quality of service after consolidation. Which per-partition processor allocation would provide comparable performance while still allowing the POWER5 hypervisor to optimize the processing workload of the server?()

    • A、4.0 processing units, 4 virtual processors, capped mode
    • B、4.0 processing units, 4 virtual processors, uncapped mode
    • C、4.0 processing units, 8 virtual processors, capped mode
    • D、4.0 processing units, 8 virtual processors, uncapped mode

    正确答案:D

  • 第15题:

    Company.com has a 2 processor license for SLES 9 and a 2 processor license for AIX V5.3. Which of the following LPAR configurations is valid on a 4-way p5-550?()

    • A、SLES9:2 dedicated processors AIX: 2.0 processing units,4 virtual processors,uncapped
    • B、SLES9:2.0 processing units,2 virtual processors,uncapped AIX:2.0 processing units,4 virtual processors,capped
    • C、SLES9:2.0 processing units,3 virtual processors,uncapped AIX:2 dedicated processors SLES9:2.5 processing units,3 virtual processors,capped
    • D、AIX:1.5 processing units,2 virtual processors,capped

    正确答案:B

  • 第16题:

    A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics.  With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()

    • A、8 desired processing units and 8 desired virtual processors
    • B、2 desired processing units and 8 desired virtual processors
    • C、8 desired processing units and 32 desired virtual processors
    • D、2 desired processing units and 32 desired virtual processors

    正确答案:B

  • 第17题:

    Which two code fragments will execute the method doStuff() in a separate thread?()

    • A、new Thread() {public void run() { doStuff(); }};
    • B、new Thread() {public void start() { doStuff(); }};
    • C、new Thread() {public void start() { doStuff(); }}.run();
    • D、new Thread() {public void run() { doStuff(); }}.start();
    • E、new Thread(new Runnable() {public void run() { doStuff(); }}).start();

    正确答案:D,E

  • 第18题:

    A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()

    • A、Each Linux application can run in a Workload Partition, reducing the management efforts.
    • B、Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform licensing.
    • C、Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all partitions.
    • D、Using micro-partitions on Power Systems allow the workloads to share the processing resources, increasing the overall system utilization.

    正确答案:D

  • 第19题:

    单选题
    Company.com has a 2 processor license for SLES 9 and a 2 processor license for AIX V5.3. Which of the following LPAR configurations is valid on a 4-way p5-550?()
    A

    SLES9:2 dedicated processors AIX: 2.0 processing units,4 virtual processors,uncapped

    B

    SLES9:2.0 processing units,2 virtual processors,uncapped AIX:2.0 processing units,4 virtual processors,capped

    C

    SLES9:2.0 processing units,3 virtual processors,uncapped AIX:2 dedicated processors SLES9:2.5 processing units,3 virtual processors,capped

    D

    AIX:1.5 processing units,2 virtual processors,capped


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()
    A

    8 desired processing units and 8 desired virtual processors

    B

    2 desired processing units and 8 desired virtual processors

    C

    8 desired processing units and 32 desired virtual processors

    D

    2 desired processing units and 32 desired virtual processors


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    Which of the following best describes Simultaneous Multi-threading (SMT)?()
    A

    A POWER5 microprocessor feature that allocates two processors to each application

    B

    A Workload Manager feature that allows two processing threads to be executing on a single processor

    C

    An AIX v5.2 feature that allows two processing threads to be executing on a single processor concurrently

    D

    A POWER5 microprocessor feature that allows two processing threads to be executing on a single processor concurrently


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    In () technology, two separate and complete processing units run in parallel on a Single chip.
    A

    Hyper-threading

    B

    Caching

    C

    Multi-tasking

    D

    Dual-core


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    Your system performs heavy transaction processing between 8:00 A.M. and 5:00 P.M. but runs batch processing and reports after that. You decide to create a separate resource plan to govern resource allocation for each time period. Which scheduler object will you use to switch automatically between the two resource plans?()
    A

     Window

    B

     Program

    C

     Job_Class

    D

     Window group


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    To equalize the power factor of two alternators operating in parallel, the ()
    A

    field excitation of both units is adjusted

    B

    governors of both units are adjusted

    C

    phase sequence is altered

    D

    kilowatt load is evenly divided


    正确答案: C