  • 第1题:

    45 The most common definition of project success is:

    A. Within time

    B. Within time and cost

    C. Within time, cost and technical performance requirements

    D. Within time, cost, performance and accepted by the customer/user

    E. None of the above


    正确答案:D

  • 第2题:

    161 Time management is the allocation of time in a project's life cycle through the process of: A. Planning

    B. Estimating.

    C. Scheduling.

    D. Controlling

    E. All of the above


    正确答案:E

  • 第3题:

    ● The range of time allowed for an activity to be completed in is the _____.

    A Planned time (Duration).

    B Float time (LS - ES, or LF - EF).

    C Critical time (when ES = LS, or EF = LF).

    D Scheduled time (LF - ES).

    E Event.


    正确答案:D

  • 第4题:

    What is the main idea of the passage?

    A. Our life is governed by the law of time.

    B. How to organize time is not worth debating.

    C. New ways of using time change our society.

    D. Our time schedule is decided by social customs.


    正确答案:A

  • 第5题:

    I haven't seen such an interesting film _____.

    A. for a long time

    B. a long time ago

    C. since a long time


    参考答案:A

  • 第6题:

    Are you going on holiday for a long time? ()

    A. It was a long time.

    B. Two weeks ago.

    C. No. Only a couple of days.


    参考答案:C

  • 第7题:

    You create a table with the PERIOD FOR clause to enable the use of the Temporal Validity feature of Oracle Database 12c. Examine the table definition:Which three statements are true concerning the use of the Valid Time Temporal feature for the EMPLOYEES table?()

    A. The valid time columns employee_time_start and employee_time_end are automatically created.

    B. The same statement may filter on both transaction time and valid temporal time by using the AS OF TIMESTAMP and PERIOD FOR clauses.

    C. The valid time columns are not populated by the Oracle Server automatically.

    D. The valid time columns are visible by default when the table is described.

    E. Setting the session valid time using DBMS_FLASHBACK_ARCHIVE.ENABLE_AT_VALID_TIME sets the visibility for data manipulatio


    参考答案:A, B, E

  • 第8题:

    Referring to the exhibit, which statement is correct?()

    A. The packets have exceeded the time-to-live value.

    B. There is a loop.

    C. The asterisks indicate a response time out.

    D. The asterisks indicate that the traceroute is completed.


    参考答案:C

  • 第9题:

    Refering to the exhibit, which statement is correct?()

    A. The packets have exceeded the time-to-live value

    B. There is a loop

    C. The asterisks indicate a response time out

    D. The asterisk indicate that the traceroute is completed


    参考答案:C

  • 第10题:

    在STP中,关于端口的Hello Time说法正确的是()。

    A.较长的Hello Time可以降低生成树计算的消耗

    B.过长的Hello Time会导致对链路故障的反应迟缓

    C.较长的Hello Time可以增强生成树的健壮性

    D.过短的Hello Time会加重CPU和网络负担


    答案:ABD

  • 第11题:

    What is the main idea of this passage?

    A. It is important to be on time for class in the United States.

    B. The importance of being on time differs among cultures.

    C. People learn' the importance of time from the culture they are in.

    D. Students being late for class should explain the reason to their teacher.


    正确答案:B

    55.答案为B  从文章中教授的经历和调查可得知守时的重要性在不同文化中的差异,因此B为正确答案。

  • 第12题:

    Which of the following is the definition of CAS latency?()

    • A、 CAS latency is the ratio between the column access time and the clock cycle time.
    • B、 CAS latency is the ratio between the row access time and the clock cycle time.
    • C、 CAS latency is the ratio between the column access time and the data burst transfer time.
    • D、 CAS latency is the ratio between the row access time and the data burst transfer time.

    正确答案:A

  • 第13题:

    John and Mary finished the work ________.

    (A) at same time

    (B) at the same time

    (C) in same time

    (D) in the same time


    正确答案:B
    解答参考:本题考查短语at the same time“同时”。【译文】约翰与玛丽同时完成了工作。

  • 第14题:

    35 The range of time allowed for an activity to be completed in is the _____.

    A. Planned time (Duration).

    B. Float time (LS - ES, or LF - EF).

    C. Critical time (when ES = LS, or EF = LF).

    D. Scheduled time (LF - ES).

    E. Event.


    正确答案:D

  • 第15题:

    TDD表示的含义( )。

    A. transfer control protocol

    B. time division duplex

    C. time division synchronous CDMA

    D. time division multiple access


    参考答案:B

  • 第16题:

    This passage is intended to __________.

    A. discuss part-time jobs for students in general

    B. encourage students to take up part-time jobs

    C. show the benefits of part-time jobs to students' studies

    D. praise boys and girls who work part time


    正确答案:A
    文章主旨题。文章分别讨论了在男生和女生中流行的兼职工作,因此A项正确,其余各项均与文章主题无关。
    参考译文:
    打零工在美国大学生中非常盛行,但是其实许多学生高中起就开始打工了。除了在快餐店打工,另一个在青少年中很流行的工作是临时保姆。这项工作尤其适合女孩,一个可靠、负责和成熟的临时保姆可以挣到不少钱。
    而这项工作不一定是份轻松的活儿,它需要社交技巧和综合能力。一个好的临时保姆要会换尿布,还得赢得她照看的孩子的尊重,她得哄孩子上床,即使孩子睡着了也不能掉以轻心。此外,她得知道如何运用常识处理突发状况并且随时保持冷静。她还得在需要协助的情况下知道医院和警方的紧急联系方式。
    一旦孩子睡着了,临时保姆就可以看电视或者听音牙。如果真的在乎学业,还可以将这些时间用于做功课。但是不能煲电话粥,因为家长在这期间可能会与她联系。
    另一个在男孩中流行的工作是送报纸,这项工作同样需要成熟、稳重与责任感。它可以为高中生带来不错的收入。从事这项工作必须很早起床并且风雨无阻地将报纸送到每家每户,没有假日,也没有例外。

  • 第17题:

    It’s a long time since I saw you last .

    ----Yes , and it will be a long time()we meet again .

    A. until

    B. before

    C. that

    D. when


    参考答案:D

  • 第18题:

    Which of the following datatypes store time-zone information in the database?()

    A. TIMESTAMP

    B. DATE

    C. TIMESTAMP WITH TIME ZONE

    D. TIMESTAMP WITH LOCAL TIME ZONE

    E. DATETIME


    参考答案:C

  • 第19题:

    Which three tasks can be automatically performed by the Automatic Data Optimization feature ofInformation lifecycle Management (ILM)?()

    A. Tracking the most recent read time for a table segment in a user tablespace

    B. Tracking the most recent write time for a table segment in a user tablespace

    C. Tracking insert time by row for table rows

    D. Tracking the most recent write time for a table block

    E. Tracking the most recent read time for a table segment in the SYSAUX tablespace

    F. Tracking the most recent write time for a table segment in the SYSAUX tablespace


    参考答案:A, B, C

  • 第20题:

    Which operational mode command can be used to synchronize the local system time with an NTP server?()

    A. set ntp time 64.32.129.3

    B. set clock ntp 64.32.129.3

    C. set time 64.32.129.3

    D. set date ntp 64.32.129.3


    参考答案:D

  • 第21题:

    RTOS的主要实时指标不包括:()。

    A.截至时间(Finish Time)

    B.吞吐量(Throughput)

    C.生存时间(Survival Time)

    D.响应时间(Response Time)


    正确答案:A

  • 第22题:

    —— ________ I had! —— You really suffered a lot. A. What a time B. What time C. How a time D. how time


    正确答案:A

  • 第23题:

    __________her mother started to go to the meditation class,

    A. It was at about this time that
    B. That was about this time
    C. It was at about this time when
    D. It was about this time that

    答案:A
    解析:
    考查强调句。句意为“大概是在这个时间,她母亲开始上禅修课了”。It is/was…that…是强调句的标志,去掉结构词后,句子依然意义完整。若不用介词at.后面则需用关系副词when引导.故选A。