niusouti.com
更多“98 Cost management includes:A. Cost estimating/forecasting.B. Cost budgeting/cost control.C. Cost applications.D. All of the above.E. A and B only”相关问题
  • 第1题:

    Range estimating in determining cost risk probabilities requires _____ .

    A an amount of financial exposure.

    B risks and opportunities ranked in order of bottom line importance

    C contingency requirements for expected level of confidence

    D probability of cost overrun occurrences

    E All of the above.


    正确答案:E

  • 第2题:

    105 Standard of purchased material:

    A. Simplifies inventory control

    B. reduces the risk of obsolescence

    C. reduces cost of purchasing and storage

    D. All of the above.

    E. A and C only


    正确答案:E

  • 第3题:

    99 Scope management is:

    A. a project control function.

    B. employs change control.

    C. a work authorization process.

    D. considers Cost, Quality and Schedule.

    E. All of the above


    正确答案:E

  • 第4题:

    84 In which of the following cost estimating techniques are statistics models used:

    A. nonparametric cost estimating

    B. parametric cost estimating

    C. life cycle cost estimating

    D. bottom-up estimating

    E. All of the above.


    正确答案:B

  • 第5题:

    137 Range estimating in determining cost risk probabilities requires _____ .

    A. an amount of financial exposure.

    B. risks and opportunities ranked in order of bottom line importance

    C. contingency requirements for expected level of confidence

    D. probability of cost overrun occurrences

    E. All of the above


    正确答案:E

  • 第6题:

    98 Which of the following statements about the cost of quality are true?

    A. the cost of quality is the expense of nonconformance to requirements and specifications.

    B. the cost of quality are mostly the direct responsibility of workers who are manufacturing the product.

    C. quality control programs should be implemented when the cost of quality are deemed affordable by management.

    D. A and B.

    E. A and C


    正确答案:A

  • 第7题:

    Estimating schedule activity costs involves developing an(69)of the costs of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. For example, in most application areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. The cost estimating process considers whether the expected savings can offset the cost of the additional design work. Cost estimates are generally expressed in units of(70)to facilitate comparisons both within and across projects.The(71 )describes the business need, justification, requirements, and current boundaries for the project. It provides important information about project requirements that is considered during cost estimating.

    A.accuracy

    B.approximation

    C.specification

    D.summary


    正确答案:B
    解析:估算计划活动的成本涉及估算完成每项计划活动所需资源的近似成本。成本估算包括识别和考虑各种成本计算方案。例如,在大多数的应用领域,普遍在设计阶段多做些额外工作以降低执行阶段和产品运行时的潜在成本。成本估算过程考虑预期的成本节省是否能够弥补额外设计工作的成本。成本估算一般以货币单位表示,以利于在项目内和项目间进行比较。项目范围说明书描述了项目的商业要求、理由、需求和当前边界。它提供了关于在成本估算时必须考虑的项目需求的重要信息。

  • 第8题:

    Estimating schedule activity costs involves developing an(4)of the cost of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. For example, in mostapplication areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. The cost estimating process considers whether the expected savings can offset the cost of the additional design work. Cost estmates are generally expressed in units of(5)to facilitate comparisions both within and across projects. The(6)describes important information about project requirement that is considered during cost estimating.

    A.accuracy

    B.approxination

    C.specification

    D.summary


    正确答案:B

  • 第9题:

    Estimating schedule activity costs involves developing an approximation of the costs of theresources needed to complete each schedule activity. Cost estimating includes identifying andconsidering various costing alternatives. For example, in most application areas, additional workduring a design phase is widely held to have the potential for reducing the cost of the executionphase and product operations. The cost estimating process considers whether the expectedsavings can offset the cost of the

    A.project scope statement
    B.statement of work
    C.project management plan
    D.project policy

    答案:A
    解析:
    估算计划活动的成本涉及估算完成每项计划活动所需资源的近似成本,成本估算包括设别和考虑各种成本计算方案。例如:在多数的应用领域,普遍在设计阶段多做些额外工作以降低在执行阶段和产品运行时的潜在成本。成本估算过程考虑预期的成本节省是否能够弥补额外设计工作的成本。成本估算一般是以货币单位表示,以利于在项目内和项目间进行比较,项目范围说明书描述了项目的商业要求、理由、需求和当前边界,它提供了关于在成本估算时必须考虑的项目需求的重要信息。

  • 第10题:

    Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating. 空白(1)处填()

    • A、accuracy
    • B、approximation
    • C、specification
    • D、summary

    正确答案:D

  • 第11题:

    In IBM Maximo Asset Management V6.2, what does the Purchase Orders applications Distribute Costs action do?()

    • A、 Distribute the line item cost among all lines.
    • B、 Distribute the line item cost among all direct issue lines.
    • C、 Distribute the line item cost among multiple GL accounts.
    • D、 Distribute the purchase order cost among multiple GL accounts.

    正确答案:C

  • 第12题:

    单选题
    In IBM Maximo Asset Management V6.2, what does the Purchase Orders applications Distribute Costs action do?()
    A

     Distribute the line item cost among all lines.

    B

     Distribute the line item cost among all direct issue lines.

    C

     Distribute the line item cost among multiple GL accounts.

    D

     Distribute the purchase order cost among multiple GL accounts.


    正确答案: C
    解析: 暂无解析

  • 第13题:

    87 Which of the following would most likely increase the accuracy of estimating the project cost? A. Pricing out the work at lower levels in the work breakdown structure.

    B. Using historical data.

    C. Talking to people who have worked on similar projects.

    D. All of the above.

    E. A and C only.


    正确答案:D

  • 第14题:

    155 A(n) _____ system is designed to ensure the timely availability of nonhuman resources, and includes the cost in procurement, shipping/freight, storage and loss.

    A. Inventory control.

    B. Materials management.

    C. Procurement.

    D. All of the above.

    E. A and C only


    正确答案:B

  • 第15题:

    146 The planned cost for the total project at its inception is called the _____.

    A. Cost of goods sold.

    B. Depreciable value.

    C. Budgeted cost.

    D. All of the above.

    E. B and C only


    正确答案:C

  • 第16题:

    127 Cost management includes processes that are required to maintain financial control of projects. These processes may include:

    A. economic evaluation

    B. cost estimating

    C. cost forecasting

    D. B and C

    E. All of the above


    正确答案:E

  • 第17题:

    166 In which of the following cost estimating techniques are statistics models used:

    A. nonparametric cost estimating

    B. parametric cost estimating

    C. life cycle cost estimating

    D. bottom-up estimating

    E. All of the above


    正确答案:B

  • 第18题:

    180 Cost management includes:

    A. Cost estimating/forecasting.

    B. Cost budgeting/cost control.

    C. Cost applications.

    D. All of the above.

    E. A and B only


    正确答案:D

  • 第19题:

    “Cost of quality”is a project management concept that includes cost of( 73)

    A.exceedings requirements

    B.Changes to the requirements

    C.Ensuring conformance to requirements

    D.The quality control requirements


    正确答案:C

  • 第20题:

    Much of the effort cost control involves analyzing the relationship between the consumption of project funds and the work being accomplished for such expenditures . The key to effective cost control is the management of the approved ( ) .

    A.Schedule baseline
    B.Cost baseline
    C.Cost output
    D.Cost input

    答案:B
    解析:
    解析:翻译:成本控制的大部分工作涉及分析项目资金消耗与这些支出所完成工作之间的关系。有效成本控制的关键是管理批准的( )。A.进度基准B.成本基准C.成本输出D.成本输入

  • 第21题:

    Which two statements about spanning tree path cost are true?()

    • A、The path cost can be changed for an interface using the spanning-tree cost command
    • B、The path cost can be changed for an interface using the stp path-cost command
    • C、The SPT default path cost depends on the interface speed
    • D、The STP default path cost is similar for all interface

    正确答案:A,C

  • 第22题:

    Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating. 空白(3)处填()

    • A、project scope statement
    • B、statement of work
    • C、project management plan
    • D、projectpolicy

    正确答案:A

  • 第23题:

    多选题
    Which two statements about spanning tree path cost are true?()
    A

    The path cost can be changed for an interface using the spanning-tree cost command

    B

    The path cost can be changed for an interface using the stp path-cost command

    C

    The SPT default path cost depends on the interface speed

    D

    The STP default path cost is similar for all interface


    正确答案: D,A