问题:单选题A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical spec...
查看答案
问题:单选题A customer asks the pSeries technical specialist to recommend which remote access (SSH or Telnet) method to use. What question should the customer be asked to best determine the proper recommendation?()A Is there a need for a PKI Management System?B I...
问题:单选题The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors. The system is a test system to run AIX 5.2. The customer has stated a preference for internal disks for the boot devices. The customer has said they may lat...
问题:单选题A customer is putting together a high-performance computing cluster of p655 nodes. They need a total of 48 processors and want to get the best performance possible out of those systems. They are evaluating four options and have asked the pSeries tech...
问题:单选题Which of the following benchmarking ratings cover essentially the same performance metrics associated with commercial applications for IBM UNIX systems?()A AB BC CD D...
问题:单选题A customer is very concerned about maintaining a competitive advantage through the use of state-of-the-art technology. Assuming all solutions meet the customer’s technical requirements, which solution should the IBM team propose to maximize customer s...
问题:单选题A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the da...
问题:单选题A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services. What information should the account executive provide to the customer to assure them that the technical special...
问题:单选题What is one benefit of using the IBM eConfig configuration tool?()A It warns users of parts availability constraints.B It provides a record of discounts used in the past.C It optimizes the adapter selection based on function and cost.D It provides vali...
问题:单选题The pSeries technical specialist has been asked to verify a solution that has six servers connecting to a 7316-TF3 rack-mounted flat-panel console. Each server will connect into the 4202 Keyboard/Video/Mouse (LCM Switch). What is the minimum number...
问题:单选题A customer is evaluating an IBM commercial solution against a 16-way rx8620 Integrity (Itanium). The pSeries technical specialist should lead with which of the following IBM systems?()A IBM p5-570 8-wayB IBM p5-570 4-wayC IBM p5-570 2-wayD IBM p5-570 1...
问题:单选题The customer has recently installed a pSeries p5-570 with EMC attached disk storage. After installation, the customer complained that the disk access appeared to be too slow. How should the pSeries technical specialist best assist the customer?()A Re...
问题:单选题During a presentation on the p5 machines, a customer asks the pSeries technical specialist a question regarding the differences between POWER4+ and POWER5. In addition to new advanced power management, SMT, and larger L2 and L3 caches in POWER5, which...
问题:单选题A customer is evaluating the purchase of a new p570 8-way Express to replace their current set of ten 2-way database and application servers that are more than five years old. In addition to savings potential in the areas of operating system and datab...
问题:单选题A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. The pSeries technical specialist should make the customer aware of which IB...
问题:单选题A customer is looking for a reliable well-performing, cost-effective solution to a growing commercial workload. Initially, they want to run 12 UDB partitions, each of which would need two processors and 8GB of memory. They are looking at the p655 an...
问题:单选题A customer needs both a database and application server to communicate over a network. The new systems will be connected to the same network as the current IBM equipment with known IBM serial numbers. How could a pSeries technical specialist best det...
问题:单选题A p5-550 with AIX 5.3 is being designed for availability. In addition to providing redundant adapters, which of the following should also be provided?()A Redundant processor pools, UPS, and HACMPB Redundant service processors, HACMP, and mirrored AIX d...
问题:单选题Which of the following lists of items all require an HMC to function with POWER5?()A Running AIX 5.3 Implementing HACMP Implementing Static LPARB Implementing Advanced POWER Virtualization Running Linux Attaching RIO drawersC Implementing VIO Server Im...