问题:单选题The pSeries technical specialist has been asked to verify a solution that has six servers connecting to a 7316-TF3 rack-mounted flat-panel console. Each server will connect into the 4202 Keyboard/Video/Mouse (LCM Switch). What is the minimum number...
查看答案
问题:单选题A customer wants a configuration for a new system that includes Reserve CoD. Which of the following systems would be the most appropriate to configure for them?()A p5-550B p5-520C pSeries p650D pSeries p630...
问题:单选题A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical spec...
问题:单选题A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. The pSeries technical specialist should make the customer aware of which IB...
问题:单选题Which of the following is the most cost effective required solution to support the boot disks internally for two partitions on a p5-520 running AIX 5.3 without the Advanced Virtualization feature?()A Optional 4-packB 7311-D20 RIO drawerC Optional 4-pac...
问题:单选题What is the minimum number of p5-570 building blocks required to support 16 RIO drawers?()A 1B 2C 3D 4...
问题:单选题A solution provider has identified a number of risks with a configuration in a customer’s request for bid. What is the most appropriate action to take to mitigate those risks for the customer?()A Decide not to bid.B Provide a solution in the bid.C Pro...
问题:单选题Which of the following people does IBM recommend be involved with a Pre-Sales Solutions Assurance Review?()A The customer executive who is funding the projectB IBM Global Financing when they are financing the purchaseC Subject matter experts representi...
问题:单选题What is a key advantage of the POWER5 technology over all other competitive offerings?()A POWER5 supports multiple operating systems.B POWER5 supports more nodes in a clustered environment.C POWER5 hypervisor has significantly less overhead than hardwa...
问题:单选题A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the da...
问题:单选题A p5-550 with AIX 5.3 is being designed for availability. In addition to providing redundant adapters, which of the following should also be provided?()A Redundant processor pools, UPS, and HACMPB Redundant service processors, HACMP, and mirrored AIX d...
问题:单选题What is the main reason for doing a Solutions Assurance Review with the customer? ()A To revalidate the total solutionB To overcome objections to the solutionC To review the pricing with the customerD To ensure the customer has the correct applications...
问题:单选题The pSeries technical specialist has a number of tasks to perform and does not have time to do them all. It is a week before the end of quarter and the account executives all state that their individual requests are the highest priority. How should t...
问题:单选题A customer has an existing SP system and needs to add cards to some of the nodes. Which of the following applications must be used to configure the upgrade?()A MRPDPlus toolB Inventory ServicesC PCRS6000 Portable ConfiguratorD eConfig - IBM Configurat...
问题:单选题A customer is very concerned about maintaining a competitive advantage through the use of state-of-the-art technology. Assuming all solutions meet the customer’s technical requirements, which solution should the IBM team propose to maximize customer s...
问题:单选题The sales team has brought in the pSeries technical specialist to recommend the best solution to win the business. The customer wants the lowest purchase cost four-disk solution using an external I/O solution. Which of the following offerings provid...
问题:单选题Which of the following lists of items all require an HMC to function with POWER5?()A Running AIX 5.3 Implementing HACMP Implementing Static LPARB Implementing Advanced POWER Virtualization Running Linux Attaching RIO drawersC Implementing VIO Server Im...
问题:单选题A commercial customer will soon send out a Request For Pricing (RFP) for a new large database server. Why would a pSeries technical specialist try to influence the customer to base the requirements on performance (TPC-C, Ideas International Relativity...
问题:单选题A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs. The current applications are certified on AIX 5.2 but not yet on AIX 5.3. The customer wants to understand the advantages and disadvantages of this solut...
问题:单选题Which of the following is required to connect a partitioned p5-550 to a modem?()A A modem adapterB An async adapter and serial cableC An Ethernet adapterD A 9-pin to 25-pin converter and serial cable...